Tower preparations

The new tower has to be put together. The top section is lifted. Using my 3x380VAC winch with electrical (mechanical) brake.

Heavy machinery can not been used to remove the towers fron the lawn.

     
 

Winch

This is not a ''one-men's-job'' but I have to do it myself without backup. The winch has been secured at the wooden Euro-pallet to prevent release and the wire is attached to the tower section.

     
 

Pull

Pulling the two sections from the back yard.

     
  Turn

rotate the two sections 180 degrees.
     
 

Rotate

It needs some agility, but after some movements the sections are turned into the right position.

     
 

Work

Using wooden poles to support the sections and it makes sliding simply.

     
 

Pull

The inner section pulled out the outermost section.

     
 

Position

Two sections are in position

     
 

Next

The primary section is dismantled

     
 

Section

Four sections in place...

     
 

Furthermore

After screwing the sections together, cleaning and repainting the tower will be placed onto the NCRT tower base rotor.

     
 

Cleaning

Some verdigris moss on the tower has to be cleaned with high pressure

     
 

Damage

Athough the tower sections are hot dipped galvanized and painted there is some damage which has to be resolved.

     
 

Painting

Using Prestofix, corrosion resistant ground and topcoat for industrial application. painting with RAL 7035 Light Grey. Specially used for antenna towers.

     
 

Painting

It took me one full day to do all the sections....

     
 

Top tube

90mm top tube has been painted also.

     
 

Result

Painted tower sections ready for lifting...

     
 