Towers

 
NCRT
 
Fitting and Measuring
 
 

Trail setup

NCRT base plate

Using a wheelbarrow for transport from the barn to the tower.

     
  Lifting

With one person only lifting >100kg is not done. therefore I am using my sense and construct a temporary scaffolding.
     
  Straps

Two adjustable struts and straps to secure the temporary scaffolding.
     
  Grease

Lifting equipment is a ratchet hoist.
     
  Lift

Without any force this is an one man's job...
     
  Opposite

Big strap on the other side to prevent overturn the scaffolding.
     
 

Wood

Using two wooden planking to lead the HEB260 to the top of the towerbase.

     
  Easy

Looks easy....
     
  Line

Positioning the construction straight on the tower base, line the holes onto the base and removing the irion girders.
     
 

Drilling

30mm hole through 19mm plates...

     
 

M24

The HEB-constrcution will be firmly fixed with M24 nuts and bolts.

     
 

Welding

Extra supportplates between the beams.

     
 

Welding

@ the tower base...

     
 

Token "PA1A"

After this all material wil be galvanized.

     