|
||||||
Antennas |
4-element 7 MHz OWA 52ft Boom |
Driver element construction |
||||
---|---|---|---|---|---|---|
Construction an isulated driver One lenght (1m= 3,28ft) off POM-C comes in between the radiator center. |
||||||
POM-C has high mechanical strength, stiffness, hardness and toughness. Excellent resilience. Good creep resistance High impact strength, even at low temperatures. Very good dimensional stability (low water absorption) Good sliding properties and wear resistance Excellent machinability Good electrical insulating and dielectric properties Physiologically inert Not self-extinguishing |
||||||
Using STAUFF HEAVY clamps to secure the radiator with insulator. |
||||||
In Europe Hydroflex clamps are easier to obtain. |
||||||
Cutting 485 lbs aluminium tubes |
||||||
How to fit metric tube sizes? |
||||||
This size and lenght does not fit into my lathe, so I have to think about a solution: WOOD TREATMENT IS THE SOLUTION |
||||||
Inserting long heavy tubes by ONE-MAN Inserting smoothly and easy with no slack within the tubes. This method is solid, permanent and makes the tubes mechanical and electrical tight. |
||||||
Using a flamethrower when for ultimate mechanical strenght. |
||||||
Fixed 2,5'' and 2'' radiator tubes |
||||||
One lenght (1m= 3,28ft) off POM-C comes in between the radiator center. |
||||||
GO TO NEXT PAGE--> ELEMENT TUBE CONSTRUCTION |
Back to TOP |